NEC4 · ECC 60.1(1)
Scope provided by the Contractor for its design
The Scope the Contractor writes for its own design, named in Contract Data part two. Changing it at the Contractor's request is not a compensation event.
Also written as
- Contractor's Scope
- Scope provided by the Contractor
Lessons that teach this
- Rankings and the Contractor's ScopeRankings and the Contractor's ScopeCase Law · Module 4 · 5 min Members
- What the Scope is and who changes itValid compensation events · Module 1 · 6 min Free
- The two exclusionsThe two exclusionsValid compensation events · Module 4 · 6 min Members
- The Contractor's designThe Contractor's designValid compensation events · Module 4 · 6 min Members
- The Contractor's designThe Contractor's designContract Preparation · Module 7 · 6 min Members
- Proposals and savingsProposals and savingsValid compensation events · Module 4 · 6 min Members
- Who gets the benefit of the doubtWho gets the benefit of the doubtValid compensation events · Module 3 · 6 min Members
Where you meet it
- Module 7: Drafting Scope and Site Information that avoids argumentContract Preparation
- Module 1: Does the instruction change the Scope?Valid compensation events · Free
- Module 4: The exclusions and the Contractor's designValid compensation events