NEC4
Engineering and Construction Contract
The NEC4 contract for engineering and construction work with any level of Contractor design. It is the main contract these courses teach.
On the Aldermere project
Aldermere Water and Merrow Vale Civils Ltd use the ECC with Option C.
Also written as
- ECC
- the ECC
Lessons that teach this
- What makes up an ECCContract Preparation · Module 0 · 5 min Free
- The NEC4 family and the short formsContract Preparation · Module 1 · 5 min Free
- Services, supply and other formsContract Preparation · Module 1 · 5 min Free
- Drawing the contract mapContract Preparation · Module 1 · 7 min Free
Where you meet it
- Module 1: Which NEC4 contract for which relationshipContract Preparation · Free