FIDIC 2017 · FIDIC 1.1.66
Programme
The Contractor's detailed programme once the Engineer has not objected to it, whether by Notice or by silence. It matches the ECC Accepted Programme.
“a detailed time programme prepared and submitted by the Contractor” (FIDIC 1.1.66)
On the Aldermere project
Dana gave no Notice on Merrow Vale's revised programme, so it became the Programme from 26 February 2026.