FIDIC 2017 · FIDIC 1.1.47
JV Undertaking
The letter, sent with the tender, in which the members of a joint venture contractor accept joint and several liability to the Employer.
“undertaking to be jointly and severally liable to the Employer” (FIDIC 1.1.47)
Lessons that teach this
- When documents conflictNEC4 vs FIDIC 2017 · Module 1 · 7 min Free