FIDIC 2017 · FIDIC 1.1.76
Specification
The Red Book document that specifies the Works, with any changes made under the contract. With the Drawings, it is the nearest match to the ECC Scope.
“the document entitled specification included in the Contract” (FIDIC 1.1.76)