Waleed Tariq Academy

NEC4 · ECC Schedule of Cost Components 21 to 24

time required

The time Equipment is needed for the work. Items 21 to 24 multiply their rates by it, not by the time the Equipment is on hire.

Also written as

  • time for which the Equipment is required

Lessons that teach this

Where you meet it