NEC4 · ECC Option A 63.12 and Option B 63.12
value engineering percentage
The percentage of an accepted Contractor saving that is taken off the Prices under Option A or B. The Contract Data sets 50% unless it states another.
Lessons that teach this
- Savings, changes and checksSavings, changes and checksCase Law · Module 11 · 5 min Members
- Priced Options A and BPriced Options A and BContract Preparation · Module 3 · 5 min Members
Where you meet it
- Module 11: Priced contracts under Options A and BCase Law
- Module 3: How the main Options pay the ContractorContract Preparation